Our Projects
Delivering Excellence Across the UK
Explore our portfolio of successful building management and electrical engineering projects. From commercial offices to industrial facilities, we deliver results that exceed expectations.
50+
Projects Completed
£1.5M+
Project Value
100%
Client Satisfaction
30%
Avg. Energy Savings
Featured Projects
A selection of our recent work showcasing our expertise and commitment to excellence

Commercial Office
20 Gresham Street
London, UK
2025
Installed a complete BMS system across six floors of a high-rise commercial office building. Works included in-house panel build, full site-wide cabling, FCU controller wiring, and final commissioning. Both Trend and Distech systems were integrated seamlessly with the existing infrastructure. Delivered with zero disruption to live areas.
BMS InstallationPanel BuildTrend & Distech Integration

Sports & Leisure
Wembley Stadium
London, UK
2024
Retrofitted existing HVAC control architecture with Trend IQ4 controllers, replacing legacy Honeywell hardware. Integrated FCUs into the new network and enabled remote monitoring to give the client visibility across critical systems within a live stadium environment.
HVAC RetrofitTrend IQ4 ControllersRemote Monitoring

Laboratory & Office
AstraZeneca Campus – Pancras Square
London, UK
2025
Installed Trend IQECO controllers and deployed BACnet integration as part of AstraZeneca's high-spec laboratory and office fit-out. Works included controller commissioning and network rollout, enabling centralised control of plant equipment and HVAC zones across multiple floors.
Trend IQECOBACnet IntegrationMulti-Floor Control

Educational Facilities
University of Arts London – Central London
London, UK
2025
Comprehensive retrofit of over 100 cabinet unit heaters and Trend IQECO controllers across six floors of teaching blocks. All works carried out after hours with zero disruption to teaching activities. New dual-shaft motors, temperature sensors, and control upgrades delivered improved reliability and system performance.
Cabinet Heater RetrofitTrend IQECOAfter-Hours Installation

Commercial Office
10 Whitechapel
London, UK
2025
Complete BMS installation featuring Trend IQ4 ECO controllers, BACnet/IP integration, and Sontay field devices. In-house panel manufacturing, CO₂ sensors, chilled beam controls, electrical metering, and auditorium bi-fold partition monitoring. New Cat-6 network riser backbone with upgraded cable management systems.
Trend IQ4 ECOBACnet IntegrationIn-House Panel Build

Events & Exhibition
Excel Arena – London Docklands
London, UK
2025
Installed four new inverters for the plant room smoke extract system to allow use as supply fans. Isolators were installed for each inverter and powered from the existing fire and BMS panel. All works included containment via tray and Unistrut, using tri-rated control cabling throughout.
Inverter InstallationFire & BMS IntegrationPlant Room Works

Commercial Office
Pinsent Masons – City of London
London, UK
2025
Upgraded fan coil networks across 16 floors. Each FCU was fitted with a new Trend controller, fresh air and return air sensors. Installed new 4NC panels on each floor, integrated with a site-wide Light-Fi backbone network. All works were completed with weekend-only access.
16-Floor UpgradeTrend ControllersLight-Fi Network

Commercial Office
Watchmaker Court – Clerkenwell
London, UK
2025
Supplied and installed a bespoke MCC panel into the main plant room to provide upgraded distribution and expansion for control systems on site.
MCC PanelDistribution UpgradePlant Room

Mixed-Use Development
The Shard – London Bridge
London, UK
2025
Installed inverters for new pumps in the plant room. Ran new BMS signal cabling and electrical supplies to each inverter, mounted isolators, and installed all necessary trunking and conduit. Final commissioning integrated the equipment into the wider Trend system.
Inverter InstallationBMS CablingTrend Integration

Educational Facilities
London Metropolitan University (LMU) – Multiple Campuses
London, UK
2025
Installed new energy metering across multiple electrical panels and buildings. All meters were connected to the central BMS for consumption tracking, alarms, and reporting functionality.
Energy MeteringMulti-SiteCentral BMS

Government
HMLR Croydon – Multi-System Works
Croydon, UK
2025
Carried out phased BMS disconnection and reconnection works across various plant rooms. This included CMS and control cabling removal for redundant systems (calorifiers, chillers), installation of new containment and wiring for water tank level sensors, and pressurisation unit reconnection.
Phased WorksSystem RemovalSensor Installation

Commercial Office
Hallmark Building – Leadenhall & Fenchurch
London, UK
2025
Conducted full BMS validation across dual buildings, mapping points, assessing cable terminations, and issuing comprehensive technical reports to inform client-led upgrade and remedial works.
BMS ValidationTechnical ReportsDual Buildings

Commercial Office
15 Rathbone Place – Fitzrovia
London, UK
2025
Supplied BMS validation and reporting on 3rd floor office spaces. Identified system health, connectivity, and expansion capacity to inform follow-on works.
BMS ValidationSystem Health CheckReporting

Commercial Office
10 Grosvenor Street – Mayfair
London, UK
2025
Modified fan coil unit controller networks within a premium commercial office fit-out. Upgrades enhanced response times, sensor accuracy, and tenant control interfaces.
FCU NetworksPremium Fit-OutTenant Controls

Commercial
The Grove Centre – Kent
Kent, UK
2025
Supplied a qualified BMS engineer to inspect HVAC and controls infrastructure. Delivered written report and recommendations on system performance and optimisation.
BMS InspectionHVAC ReviewPerformance Report

Commercial Office
Clarins HQ – Croydon
Croydon, UK
2025
Carried out a BMS system review at the client HQ. Provided validation of all key plant interfaces and generated technical report to assist facilities team planning upgrades.
System ReviewPlant ValidationTechnical Report

Commercial Office
25 Savile Row – Mayfair
London, UK
2025
Installed and tested Cat6 cabling for panel network integration. All terminations were verified and certified to support expanded BMS communications.
Cat6 CablingNetwork IntegrationCertification
Sectors We Serve
Experience across diverse industries and building types

Commercial Offices

Industrial Facilities

Healthcare

Education

Hospitality

Retail

Data Centres

Residential

Government

Sports & Leisure

Warehousing

Mixed-Use Developments